icon Skip to content
Warranty

Manufacturer's warranty on most items

Great Discounts

Your favorite products on sale

Expert Assistance

Need help? Give us a call at +1 888 575-2099

Free Shipping

We offer free shipping since April 11th

Cimarron Sports Premier 7'x7' L-Screen With #84 Netting - CMH-7x784PLNFW

SKU CMH-7x784PLNFW
Save up to 5% Save 5%
Original price $509.00
Original price $509.00 - Original price $579.00
Original price $509.00
Current price $483.99
$483.99 - $550.99
Current price $483.99
  • CLEARANCE SALE.

  • ITEMS LEFT.

  • PEOPLE are also watching that product.


The best professional-grade line of protection screens on the market are the Cimarron Premier Series

The Cimarron Premier protection screens were developed specifically for colleges to ensure durability and mobility!

About The Cimarron Premier L-Screen

Each screen is made with 13-gauge U.S. steel and #84 netting. The Premier 7'x7' L-frame is 7-foot-tall and 7-foot-wide (3’6”x3’6” cutout) with a wheel assembly built into the frame (10” wheels included). The Net is applied to the frame pillow-case style for twice the safety. To increase the lifespan of your frame you can also add premium padding.

Order shipment preparation takes 3 days. Once shipped orders usually take 2 weeks to be delivered. These are estimations; delivery can be delayed for reasons beyond our control. You can always contact us to know the exact delivery time once you placed an order with us. Have a look at our shipping policy here.

 

The best professional-grade line of protection screens on the market are the Cimarron Premier Series

The Cimarron Premier protection screens were developed specifically for colleges to ensure durability and mobility!

About The Cimarron Premier L-Screen

Each screen is made with 13-gauge U.S. steel and #84 netting. The Premier 7'x7' L-frame is 7-foot-tall and 7-foot-wide (3’6”x3’6” cutout) with a wheel assembly built into the frame (10” wheels included). The Net is applied to the frame pillow-case style for twice the safety. To increase the lifespan of your frame you can also add premium padding.

Order shipment preparation takes 3 days. Once shipped orders usually take 2 weeks to be delivered. These are estimations; delivery can be delayed for reasons beyond our control. You can always contact us to know the exact delivery time once you placed an order with us. Have a look at our shipping policy here.