Only a few left—secure yours before it’s gone for good!
Your items are reserved, but only for a limited time!
Grab it now at a discounted price before the deal ends!
Use this Hoshizaki HS-5300 35' remote ice machine condenser line kit to connect your remote cooled ice machine to a SRC-10J remote condenser. These lines are vital components, as they will reliably exchange refrigerant between the two units and ensure smooth operation.
This line set allows you to install your condenser unit on the roof or in another location away from the rest of your operation. This helps to reduce clutter in your kitchen, streamline your workspace, and eliminate additional heat build-up or strain on your HVAC system. This line set will require refrigerant to be added and will need brazing at the time of installation.
Quantity |
1/Each |
---|---|
Length | 35 Feet |
Type |
Line Sets |
Remote Installation Flexibility: The 35-foot length of the HS-5300 tubing kit allows for versatile placement of the remote condenser, reducing heat and noise in the main workspace.
Compatibility: Designed to connect Hoshizaki ice machines to SRC-10J remote condensers, ensuring efficient refrigerant exchange.
Installation Requirements: Installation requires brazing and the addition of refrigerant, necessitating professional setup.
Durable Construction: Built to withstand the demands of commercial environments, ensuring long-lasting performance.
Enhanced Efficiency: Facilitates optimal operation of ice machines by managing heat dissipation effectively.
Q: What is the Hoshizaki HS-5300?
A: A 35 ft tubing kit designed for ice bin installations.
Q: Is installation complex?
A: Yes, brazing is required for proper setup.
Q: What is the kit compatible with?
A: Designed to work with Hoshizaki ice bins and related refrigeration units.
Q: What materials are used?
A: High-quality, durable tubing for reliable performance.
Q: Is it suitable for commercial use?
A: Yes, built to meet commercial refrigeration standards.
Inspect tubing regularly for leaks or corrosion.
Ensure proper brazing connections to prevent leaks and maintain system integrity.
Keep tubing clean and free from obstructions.
Check fittings and SRC-10J components periodically for wear.
Schedule professional inspection to ensure optimal performance and safety.